Kitchen Plumbing Rough-In
A kitchen sink needs hot and cold supply, a drain, and a vent. A dishwasher needs supply, drain, and power. A pot filler needs a cold line and a shutoff. Each fixture has a rough-in dimension that the cabinet and counter must accommodate. The plumber, cabinet maker, and counter fabricator need to work from the same plan.
At a glance
- Planning cost
- $1,800–$7,500
- Timeline
- 5 days
- Heat / moisture
- 9/10
- Slip / stain
- 8/10
- Maintenance
- Low
Supply lines and shutoffs
Most kitchen sinks use 1/2 inch supply lines with 3/8 inch compression connections at the faucet. Install a dedicated shutoff valve for hot and cold under the sink. Use braided stainless connectors, not plastic, and leave enough slack to pull the faucet for service.
A pot filler needs a cold-water line, a dedicated shutoff, and blocking in the wall. The rough-in height depends on the range and the hood. Confirm the arm reach and the swing before the wall is closed.
| Fixture | Supply | Drain | Notes |
|---|---|---|---|
| Kitchen sink | 1/2 in hot and cold | 1.5 to 2 in | Vent required |
| Dishwasher | 1/2 in hot | 1.5 in or air gap | High loop or air gap |
| Pot filler | 1/2 in cold | None | Dedicated shutoff |
| Beverage fridge | 1/4 in cold | None | Shutoff accessible |
| Prep sink | 1/2 in hot and cold | 1.5 in | Vent required |
Drain size and venting
A kitchen sink drain is typically 1.5 to 2 inches. The drain must connect to a vented trap arm. A sink under a window may need an air admittance valve or a re-route; check the local code. A proper vent prevents gurgling and slow drainage.
A dishwasher drain should have a high loop or an air gap, depending on the code. The drain hose should not be kinked or run uphill. A clogged dishwasher drain is often a installation problem, not an appliance problem.
Sink location and cabinet coordination
The sink cabinet has to fit the basin, the faucet, the drain, and the disposal. A farmhouse sink needs a modified cabinet and a counter cutout. A workstation sink needs a deep cabinet and a precise cutout. Confirm the sink template before the counter is fabricated.
The drain location affects the cabinet layout. A center drain leaves more usable storage; an offset drain can make room for a pull-out. A disposal needs space and a power outlet. Plan the cabinet interior, not just the sink opening.
- Confirm the sink cutout template with the fabricator.
- Leave room for the disposal and the drain trap.
- Put the shutoffs where they can be reached without removing a drawer.
- Use a high loop or air gap for the dishwasher.
Testing and inspection
Pressure-test the supply lines before the walls are closed. Fill the drain system and check for leaks. Run the dishwasher through a cycle and check the drain. Test the pot filler and the shutoff.
Take photos of the rough-in before the cabinets go in. They are useful for future repairs and for confirming the location of a shutoff or a vent. Keep the inspection sign-off with the project file.
The installation sequence.
- Mark the sink, dishwasher, pot filler, and beverage fridge locations.
- Confirm the supply and drain rough-in dimensions with the fixture specs.
- Install shutoffs for every supply line.
- Vent the sink trap and the dishwasher drain per code.
- Pressure-test the supply lines and check the drains.
- Photograph the rough-in before the walls are closed.
- Confirm the sink template with the counter fabricator.
What to remember.
- Every fixture needs a shutoff and a service path.
- Drain size and venting are not optional details.
- A farmhouse or workstation sink needs a modified cabinet.
- Photograph the rough-in before the cabinets hide it.
Field note
Put the sink shutoffs slightly to the side of the cabinet, not directly behind the drain. It is easier to reach them when the cabinet is full.
The schedule
Guide profile in one table.
The same fields used across the benchmark set, so this guide can be compared with the styles, layouts, and materials it references.
| Field | Value |
|---|---|
| Topic | Plumbing |
| Read time | 4 minutes |
| Sections | 4 |
| Steps | 7 |
| Data tables | 1 |
| Planning cost | $1,800–$7,500 |
| Install timeline | 5 days |
| Heat / moisture | 9/10 |
| Slip / stain | 8/10 |
| Maintenance | Low |
| Ideal room | 60 sq ft–500 sq ft |
| Task light | 3000K |
Apply the guide
Where this rule meets a plan.
The guide is only useful when it meets a measured layout. These combinations apply the same dimensions to a specific style and material schedule.
Japandi / Single-wall kitchen
001Single-Wall Compact Kitchen
- Size
- 10 × 12 ft
- Budget
- $37,900–$97,200
- Build
- 37–72 d
Japandi / Galley kitchen
002Galley Double-Run Kitchen
- Size
- 9 × 14 ft
- Budget
- $47,450–$121,000
- Build
- 37–73 d
Shaker Transitional / Single-wall kitchen
003Single-Wall Compact Kitchen
- Size
- 10 × 12 ft
- Budget
- $44,200–$116,600
- Build
- 44–82 d
Shaker Transitional / Galley kitchen
004Galley Double-Run Kitchen
- Size
- 9 × 14 ft
- Budget
- $57,150–$150,550
- Build
- 44–83 d
The trade-offs
What the guide assumes.
Every rule has a boundary. These are the conditions behind this one.
What works
- A planned rough-in avoids costly cabinet and counter changes.
- Dedicated shutoffs make service easier.
- A proper vent prevents slow drains and gurgling.
What to watch
- Moving a drain or vent can be expensive.
- A farmhouse sink needs cabinet modification.
- Code requirements vary by jurisdiction.
Read next
Related field guides.
The next question is usually one section over.
Kitchen planning / 5 min
G01Work Triangle Leg Dimensions
A measured guide to the sink-cook-fridge triangle, including leg lengths, total travel, obstruction rules, and plan-specific exceptions.
Clearances / 4 min
G02Kitchen Aisle Clearance Standards
A practical guide to kitchen aisle widths, appliance door clearances, seating clearance, and the difference between a code minimum and a comfortable work zone.
Countertops / 4 min
G03Countertop Hardness, Stain & Heat
A material-by-material guide to Mohs hardness, heat resistance, stain and etch risk, edge durability, and sealing for kitchen counters.
FAQ
Plumbing questions.
Practical answers drawn from the specification, cost model, and installation sequence.